10


Glenmont | Construction

Acting as Principal Contractor Neary undertook design, supply and Installation of the grid connection for Todmorden wind farm. Neary undertook every aspect of the works required to construct the contestable grid connection for the 8 turbine wind farm with a capacity of up to 20mW 21MVA to allow for the maximum turbine generation of 2.

Irthlingborough

Siemens | Construction

This contract involved the diversion of numerous 33kV & 11kV cable circuits from within the High Voltage switch yard and the surrounding land into a containerised substation sited on piled stilts. The majority of the cables were installed pre-outage; numerous visits back to site over the last 12 months have seen each cable circuit turned into its final termination position.

Alstom Stafford TX Factory

Alstom | Construction

In order to facilitate the testing of some newly manufactured Quad Boosters the client (Alstom) approached Neary to enquire on a very difficult 132kV cable installation that would be required to deliver test voltages to the new equipment. Having looked at the route it was clear to see why their incumbent suppliers shied away from the proposal.

Staythorpe Heavy Lift Facility

Hyundai Heavy Industries | Construction

This contract necessitated the Project Management of a heavy lift and the subsequent road movement of a 400kV transformer off the River Trent to National Grid Staythorpe substation. The Hyundai transformer had travelled by sea from Korea to Hull where it was then loaded onto an Inland Navigator vessel.

Abergele Transition RC Joint Bays

Prysmian | Construction

As part of the main Gwynt-y-Mor wind farm landfall EHV cable works four reinforced concrete joint bays were required to be constructed at the Beach Head off Abergele. As the whole of the construction process took place on the beach, the presence of tidal water impacted significantly on the installation process.

Gwynt y Mor

Prysmian (Ultimate Client: RWE Npower Renewables Ltd ) | Construction

In October 2010, works began on the Gwynt y Mor windfarm 132kV onshore connection near Abergele in North Wales.The works are being undertaken for RWE Npower Renewables Ltd by Prysmian Cables who have appointed Neary Construction as their civils and cable installation contractor.