Client | Siemens
Division | Construction
This contract involved the diversion of numerous 33kV & 11kV cable circuits from within the High Voltage switch yard and the surrounding land into a containerised substation sited on piled stilts.
The majority of the cables were installed pre-outage; numerous visits back to site over the last 12 months have seen each cable circuit turned into its final termination position.