Neary Construction Projects


Latest construction projects from Neary are shown below. Click on a project name for full details, or use the page functions to view any previous projects.

Page: 6 of 7
6

Monsanto Transformer Bund Modification

Siemens (Ultimate Client : Scottish Power) | Construction

Involved the construction of an oil retention bund around an existing 132kV transformer whilst it remained live and in service.The existing plinth was dowelled and the new structure tied into it.

Uskmouth

Prysmian (Ultimate Client : National Grid, South-West Substation Alliance) | Construction

The works, undertaken between Sept 2008 and Aug 2009, comprised of the installation of approximately 750 metres of pre-cast concrete troughs to facilitate the installation of 3000 metres of cable. The troughs carried both 132kv and 275kv cables over seven individual circuits, each running from an OSE termination to a GIS termination.

Immingham 275kV Substation

Siemens (for National Grid) | Construction

The works required the replacement of an existing combined Cess/SF6 tank within the live high voltage compound at the Conaco Humber Refinery Power Plant.A heavy duty tankbrace system was utilised in order to give safe access for operatives to a depth of 5m below ground level.

Bramley - Didcot 400kV Cable Replacement Scheme

Electricity Alliance West | Construction

Between January`08 and November `09 work began on a green-field site, in an area of outstanding natural beauty, near to the picturesque village of Streatley in West Berkshire. The works were being undertaken by the Electricity Alliance West, a partnership between National Grid, Babcock, AMEC and Mott McDonald.

Legacy Local 132kV Substation

Siemens (for Scottish Power) | Construction

Works were undertaken to demolish an existing 132kV switchgear bay and single storey brick building and replace it with a new reinforced concrete alternative. The works were hampered throughout by the presence of a very high water table and 24 hour pumping was required throughout the duration of the construction phase of the works.

Lower Lea Valley Cable Power Lines Undergrounding

Prysmian (for National Grid) | Construction

In order to provide access for the construction of the Olympic village in the East End of London a section of existing power line was undergrounded via two new tunnels bored between West Ham 400kV substation and Hackney 275kV substation. Neary Construction then provided the high voltage cable interface between the new tunnel access shafts and the termination points within the live HV compounds.