Immingham 275kV Substation


Client | Siemens (for National Grid)

Division | Construction


The works required the replacement of an existing combined Cess/SF6 tank within the live high voltage compound at the Conaco Humber Refinery Power Plant. A heavy duty tankbrace system was utilised in order to give safe access for operatives to a depth of 5m below ground level.


Immingham 275kV Substation