Armistead - Access Point Staircase

Network Rail | Rail

Network Rail (Off Track Preston) appointed Neary to replace a life expired defective Access Point Staircase in Armistead. Works remit included Topographical Survey of existing cutting, Design of GRP staircase and foundations and Installation of approved Design.

Dale Road Access Staircase

Network Rail | Rail

Network Rail awarded Neary Rail the Project to build a compliant access solution to upgrade an out of use access at Dale Road on the CNB1 line at 164m 0649y (close to Dove Holes Station) Due to the nature of the embankment with rock calcium contamination seeping through the fractures, causing the previous Steel elements to corrode.It was proposed that a new GRP access staircase design be installed onto the rock face as the best solution, allowing this rock calcium run under the walking route and stepped access and thus keeping it clear, and maintenance free.

VAMOS Signal - Pedestrian Crosisings

Network Rail | Rail

Neary Rail were awarded the Civils Package to assist Network Rail with the WD Signalling in the Commissioning of several VAMOS Signal Crossings. Scope of works involved our CRE working within the design process to resolve local issues, recovery of existing crossing systems, installation of new VAMOS post foundations and ducting, access steps and pathways on approaches.

Colwich LOC PLatform & Piling Works

Network Rail | Rail

Neary Rail were awarded by Network Rail the Civils Installation works for the Installation of the LOC Platform and Associated Foundations upon an Embankment. Neary Rail undertook Training from FLI Structures to facilitate the Installation of the Helical Pile foundations as identified within the AFC Design.

Lanark Station Refurbishment

Network Rail | Rail

Neary Rail were awarded the works acting as PC to undertake restoration to Lanark Train Station, under the CP6 BAM framework.The works involved replacing the roof with a SIGA slating system that replicates a traditional roofing slate.

Hawarden Footbridge

Network Rail | Rail

Neary Rail were contracted to carry out steel work repairs and decking replacement to Hawarden Footbridge.The current structure is located at Hawarden Station in North Wales and provided sole pedestrian access between the two station platforms.