Client | Siemens (Ultimate Client : National Grid)
Division | Construction
A single storey brick extension to an existing 275kV control building within the live HV compound, including all the M&E works. An existing deep drainage run was diverted from under the footprint of the new extension before works on the build could commence.
A new trough route was also installed through the live HV compound incorporating both cast in-situ heavy duty Gattic runs and pre-cast unit runs.