Lackenby Substation


Client | Areva (for NGC)

Division | Construction


The division carried out the installation of 2 x 275kV circuits in a mixture of pre-cast and cast-in-situ trough routes.

Access was extremely restricted due to the existing substation infrastructure and the cable system design required innovative and complex installations solutions.


Lackenby Substation